33 minutes ago, hayward said:

How are they conjoined?  Melt together or some kind of fitting?

Yes we bring in a big hydraulic machine that has a heat plate. The ends of the pipe are preped then hydraulically moved to the 2 sided heat plate. Once hot, heat plate is removed and pipes are pushed together. They are help while the "weld" to cool and take effect.  We did a 900 foot run on the other side of the job under a freeway. Once all pipe runs are in, we will dig in between the pipes and join them all together, making 1 long pipe.

Link to comment
Share on other sites

8 hours ago, steve from amherst said:

A work zone with people working. That's something ya dont see too often.

I saw no one working . A guy standing out side his excavator yes 2 guys discussing a hole yes . 2 guys making sure the tailgate is OK yes . 

Looks like a typical govenment contract 

  • Haha 2
Link to comment
Share on other sites

  • Platinum Contributing Member
1 minute ago, Ez ryder said:

I saw no one working . A guy standing out side his excavator yes 2 guys discussing a hole yes . 2 guys making sure the tailgate is OK yes . 

Looks like a typical govenment contract 

Round here you see lanes closed . Signs and no one at 1 pm

  • Haha 1
Link to comment
Share on other sites

6 hours ago, SHADOSPRIT said:

Yes we bring in a big hydraulic machine that has a heat plate. The ends of the pipe are preped then hydraulically moved to the 2 sided heat plate. Once hot, heat plate is removed and pipes are pushed together. They are help while the "weld" to cool and take effect.  We did a 900 foot run on the other side of the job under a freeway. Once all pipe runs are in, we will dig in between the pipes and join them all together, making 1 long pipe.

Each pipe comes in what, 50' lengths?  Damn that pipe looks expensive as hell.

Link to comment
Share on other sites

9 minutes ago, Ez ryder said:

I saw no one working . A guy standing out side his excavator yes 2 guys discussing a hole yes . 2 guys making sure the tailgate is OK yes . 

Looks like a typical govenment contract 

More than welcome to come out and inspect. My guys work, and we work hard....any time bud....

Link to comment
Share on other sites

  • Platinum Contributing Member
58 minutes ago, Jerry 976 said:

Is that pipe being trenched the whole way, shot with a mole/gopher or pipe bursting?? 24 inch pipe that gotta take a few minutes to fuse together...lol 

Looks like they shot it , then pulled it.

Link to comment
Share on other sites

3 hours ago, Jerry 976 said:

Is that pipe being trenched the whole way, shot with a mole/gopher or pipe bursting?? 24 inch pipe that gotta take a few minutes to fuse together...lol 

Almost all the way, we will have about 1000 ft we have to dig, connect the 2 pieces together and add more to tie in on both ends. Its a bore rig that makes the hole....yes takes a bit of time!!

  • Like 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Trying to pay the bills, lol



×
×
  • Create New...