Gold Member BOHICA Posted May 21, 2019 Gold Member Share Posted May 21, 2019 (edited) Mining copper from the water. Within a couple months they will be releasing clean and pure water into nearby streams...... 4 years ahead of deadline required by law and the EPA. https://mtstandard.com/news/local/water-leaves-the-berkeley-pit-for-first-time-in-years/article_b223ceb3-822d-5fce-ae49-aa689a227ae7.html Edited May 21, 2019 by BOHICA Quote Link to comment Share on other sites More sharing options...
Platinum Contributing Member steve from amherst Posted May 21, 2019 Platinum Contributing Member Share Posted May 21, 2019 you have to sell your soul to google to be able to read it Quote Link to comment Share on other sites More sharing options...
racinfarmer Posted May 21, 2019 Share Posted May 21, 2019 If it was a government run project, it would be 8x over budget and about 2 decades behind schedule, with no end in site. Quote Link to comment Share on other sites More sharing options...
Platinum Contributing Member steve from amherst Posted May 21, 2019 Platinum Contributing Member Share Posted May 21, 2019 5 minutes ago, racinfarmer said: If it was a government run project, it would be 8x over budget and about 2 decades behind schedule, with no end in site. I thought they just put a fence around it and a sign. Quote Link to comment Share on other sites More sharing options...
racinfarmer Posted May 21, 2019 Share Posted May 21, 2019 14 minutes ago, steve from amherst said: I thought they just put a fence around it and a sign. They'd still find a way to fuck it up. Quote Link to comment Share on other sites More sharing options...
Gold Member BOHICA Posted May 21, 2019 Author Gold Member Share Posted May 21, 2019 They would just drain it like they did in colorado a few years back Quote Link to comment Share on other sites More sharing options...
hwytohell Posted May 22, 2019 Share Posted May 22, 2019 1 hour ago, steve from amherst said: I thought they just put a fence around it and a sign. Still fucking around in St. Louis , MI Superfund site , with the normal gubermint paid clowns behind the project. Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.